International Homepage

Gaobeidian I
Home_NBtnGrau2
GelbGrauGradient
GelbGradientHorizontal

GAOBEIDIAN (PR CHINA)
METHANE MINIMZED WASTE DISPOSAL

KFW_logoClient: AWN (Buchen)
Funding: KFW Entwicklungsbank - PPP Fazilität

Duration: 2006-2007

Head of project: Dr.-Ing. M. Ginter (AWN)
Project management: Prof. Dr.-Ing. Klaus Fricke, Dr.-Ing. Florian Kölsch

Partner:
Abfallwirtschaftsgesellschaft Neckar-Odenwald, Buchen
TU Braunschweig, dept. Waste Management (Prof. Fricke)
IGW - Ingenieurgemeinschaft Witzenhausen (Dr. Müller)
AWKD Werner & Kollegen, München (Dr. Werner)
Greenstream Networks

Location:
Gaobeidian, Hebei Province, PR China

KFW_KA 

 kfw1
Situation:
Waste management and disposal in PR China is still on a poor level (left: Gaobeidian dumpsite). Sustainable improvement lacks appropriate funding.

Aim
Carbon credits are a potential cofinancing instrument. Carbon credits can be generated in CDM-projects. This requiresreorganizing the waste management of Gaobeidian. The refined waste disposal system will be mostly free of methane emissions.

Methods:
Waste analysis

kfw3kfw4 

Establishing pilot plants for MBT (Mechanical-biological treatment)

MBT according to chimney effect method
kfw11 

MBT with enforced aeration
kfw5 

Test for segregated collection of biowaste (acquiring))

KFW6AKFW7A 

Biowaste composting

KFW8A 

Impressions of China
Wastepicker in Communismkfw10

The proud of Northern China:
kfw12STADION
  The Great Wall / New Olympic Stadium (“birds nest”)
 

 

This way to the implementation of the MBT Gaobeidian

Dr. Kölsch GmbH | office@dr-koelsch.de | phone: +49 531 2094133

 

GelbHalbGradient